The final phase...
Saturday, November 29, 2008
Friday, November 21, 2008
Week 5
From these:
To these:
Living feature Wall
Shoe Rack
Dining feature wall
Kitchen Cabinet
Master Bed frame
Master feature wall
Master wardrobe
Master Toilet cabinet
Saturday, November 15, 2008
Week 4
Accomplished:
1. Grille @ balcony installed
2. Aircon installed
3. Bedrm doors changed and installed
4. Laminate floor & skirting laid
5. Carpentry works ready for installation
Friday, November 7, 2008
Week 3
Here comes Week 3...
Basically...
Basically...
The false ceiling are up..
@ Dining Area
@ Living Room
Window & Grilles are installed..
@ Balcony
@ Bedrooms
Walls & Ceiling are painted..
@ Living Room
@ Bedroom
Glass door at Kitchen is installed...
Sunday, November 2, 2008
Week 2
Into 2nd wk of the renovation..
Tiles, wires and pipings are laid.. Here's the photos.. nothing fantasic.. only wires all over the place.. keke..
Balcony Tiles
Living Room
Kitchen Room
Master Bedrm
Progress for the next 2 wks: Installation of false ceiling and carpentry works.
After much research, we had bought most of the stuffs, from lightings to electrical appliances. Oh btw went Ikea to buy their kitchen cabinet system on fri.. love them so much!! thou the ID had included those normal shelving system in their package we still prefer Ikea's kitchen system.. Nice and Neat..
Its nice to see a home gradually being built, but the cost for renovation of a house is also very 'xiong'.. Paying and Paying.. Now pockets all 'lobang'.. But we believe that a home is a long term investment with quality products. No point settle on a cheaper stuff but end of the day gotta pay more to rectify the prob right!
Hopefully, we will 'recover' in time for our wedding next yr! ;P